Session Questions
Q 1. Machines X and Y run at different constant rates, and machine X can complete a certain job in 9 hours. Machine X worked on the job alone for the first 3 hours and the two machines, working together, then completed the job in 4 more hours. How many hours would it have taken machine Y, working alone, to complete the entire job?
(A) 18
(B) 13 1/2
(C) 7 1/5
(D) 4 1/2
(E) 3 2/3
Q 2. Machines X and Y produced identical bottles at different constant rates. Machine X, operating alone for 4 hours, filled part of a production lot; then Machine Y, operating alone for 3 hours, filled the rest of this lot. How many hours would it have taken Machine X operating alone to fill the entire production lot?
(1) Machine X produced 30 bottles per minute.
(2) Machine X produced twice as many bottles in 4 hours as Machine Y produced in 3 hours.
Q 3. In order to complete a reading assignment on time, Terry planned to read 90 pages per day. However, she read only 75 pages per day at first, leaving 690 pages to be read during the last 6 days before the assignment was to be completed. How many days in all did Terry have to complete the assignment on time?
(A) 15
(B) 16
(C) 25
(D) 40
(E) 46
Q 4. A can complete a project in 20 days and B can complete the same project in 30 days. If A and B start working on the project together and A quits 10 days before the project is completed, in how many days will the project be completed?
(A) 18 Days
(B) 27 days
(C) 26.67 days
(D) 16 days
(E) 12 days
Q 5. On Monday morning a certain machine ran continuously at a uniform rate to fill a production order. At what time did it completely fill the order that morning?
(1) The machine began filling the order at 9:30 a.m.
(2) The machine had filled 1/2 of the order by 10:30 a.m. and 5/6 to the order by 11:10 a.m.
Q 6. Machines K, M, and N, each working alone at its constant rate, produce 1 widget in x, y, and 2 minutes, respectively. If Machines K, M, and N work simultaneously at their respective constant rates, does it take them less than 1 hour to produce a total of 50 widgets?
(1) x < 1.5
(2) y < 1.2
Q 7. A paint crew gets a rush order to paint 80 houses in a new development. They paint the first y houses at a rate of x houses per week. Realizing that they’ll be late at this rate, they bring in some more painters and paint the rest of the houses at the rate of 1.25x houses per week. The total time it takes them to paint all the houses under this scenario is what fraction of the time it would have taken if they had painted all the houses at their original rate of x houses per week?
(A) 0.8(80 – y)
(B) 0.8 + 0.0025y
(C) 80/y – 1.25
(D) 80/1.25y
(E) 80 – 0.25y
Q 8. Stations X and Y are connected by two separate, straight, parallel rail lines that are 250 miles long. Train P and train Q simultaneously left Station X and Station Y, respectively, and each train traveled to the other’s point of departure. The two trains passed each other after traveling for 2 hours. When the two trains passed, which train was nearer to its destination?
(1) At the time when the two trains passed, train P had averaged a speed of 70 miles per hour.
(2) Train Q averaged a speed of 55 miles per hour for the entire trip.
Q 9. Maria left home 1/4 hour after her husband and drove over the same route as he had in order to overtake him. From the time she left, how many hours did it take Maria to overtake her husband?
(1) Maria drove 60 miles before overtaking her husband.
(2) While overtaking her husband, Maria drove at an average rate of 60 miles per hour, which was 12 miles per hour faster than her husband’s average rate.
Q 10. A hiker walking at a constant rate of 4 miles per hour is passed by a cyclist traveling in the same direction along the same path at a constant rate of 20 miles per hour. The cyclist stops to wait for the hiker 5 minutes after passing her, while the hiker continues to walk at her constant rate. How many minutes must the cyclist wait until the hiker catches up?
(A) 6 2/3
(B) 15
(C) 20
(D) 25
(E) 26 2/3
